Fluids continue to be diverted from the well pad and a seep on the western corner fill slope of the pad into a lined drainage basin for removal.
Contaminated materials from remediation of areas around the pad had been removed from the site and the storage area was empty at the time of the inspection.
Contaminated areas around the well pad were hydroseeded for vegetative growth and temporary stabilization.
A borehole discovered under the former stormwater basin had a pipe installed to allow continued purging of contaminated water and sampling.
Work continued on drilling another groundwater monitoring well on the western corner of the pad. Four additional wells are planned downslope of the well pad.
The original violations issued on July 14, 2025 were continued.
Click Here for DEP’s August 28 inspection report with photos.
Well Control Incident
At 6:30 p.m on July 13, 2025, Repsol Oil & Gas USA LLC reported a well control incident at the 7H shale gas well on the Broadleaf Holdings pad that caused the “uncontrolled release” of wastewater up the well casing to the pad surface. Read more here.
Efforts to control the pressure and prevent fluids from escaping all three well annuli failed for more than 34 hours until a second temporary plug was put in the well.
DEP’s Emergency Response Team arrived onsite at 6:30 a.m. on July 14 in response to a report at 7:45 p.m. on July 13 of a well control incident “halfway through the frac” of the 7H well and found wastewater had overtopped secondary containments.
Temporary berms were constructed along the edge of the well pad and down the pad slope to collect fluids.
“Numerous gravel berms were constructed on the pad surface to help prevent fluids from escaping the pad surface” but they failed in numerous spots.
Wastewater was also collected in a stormwater control basin on the western corner of the pad.
A second and third bench/trench were constructed below the first corner berm below the well pad fill slope the next day that directed wastewater into a stormwater control basin onsite.
DEP was onsite again July 15 at 10:00 a.m. for a follow-up inspection that found a temporary plug installed in the 7H well at 9:00 p.m. on July 14 failed to prevent the fluids from reaching the pad surface and “surging” was reported. July 15 DEP inspection report.
A second temporary plug was set in the 7H well at 5:00 a.m. on July 15 which stopped all fluids Read more here.
Report Violations
To report oil and gas violations or any environmental emergency or complaint, visit DEP’s Environmental Complaint webpage.
Text photos and the location of abandoned wells to 717-788-8990.
Check These Resources
Visit DEP’s Compliance Reporting Database and Inspection Reports Viewer webpages to search their compliance records by date and owner.
Sign up for DEP’s eNOTICE service which sends you information on oil and gas and other permits submitted to DEP for review in your community.
Use DEP’s Oil and Gas Mapping Tool to find if there are oil and gas wells near or on your property and to find wells using latitude and longitude on well inspection reports.
(Photos: Row 1-- Fluids still being collected from the pad and a seep on the fill slope side of the pad; Distressed vegetation on the fill slope side of the pad; Row 2-- Hydroseeded areas where contaminated soil removed; Borehole configured to allow for purging of contaminated water and sampling.)
Resource Links:
-- DEP: Day 38 Of Cleanup: Borehole Found Under Stormwater Basin During Continuing Cleanup Of Repsol Shale Gas Well Pad After A 34-Hour Uncontrolled Wastewater Release In Bradford County [PaEN]
PA Oil & Gas Industry Public Notice Dashboards:
-- PA Oil & Gas Weekly Compliance Dashboard - Sept. 6 to 12 - Disposing Of 4.6 Million Gallons Of Oil & Gas Wastewater; 18,000 Gallon Drilling Spill; Failure To Restore Pipeline Right-Of-Way - Again [PaEN]
-- PA Oil & Gas Industrial Facilities: Permit Notices, Opportunities To Comment - September 13 [PaEN]
-- DEP Posted 82 Pages Of Permit-Related Notices In September 13 PA Bulletin [PaEN]
Related Articles This Week:
-- Environmental Quality Board Adjourns Without Discussing Or Acting On Any Of 3 Pending Oil & Gas Rulemaking Petitions [PaEN]
-- Center For Coalfield Justice To Host 500 Feet From Fracking Tour Sept. 20 In Washington County [PaEN]
-- DEP: Eureka Resources Submits Plan To Cleanup, Close All 3 Oil & Gas Wastewater Treatment Facilities, Remove 4.6 Million Gallons Of Wastewater Left In Lycoming & Bradford County Facilities [PaEN]
-- DEP: Blackhill Energy Pipeline Horizontal Drilling Accident Results In 18,000 Gallon Spill In Granville Twp., Bradford County [PaEN]
-- Energy Transfer/Sunoco To Host Sept. 15 Public Meeting To Accept Comments On Interim Site Characterization Report For Pipeline Rupture In Upper Makefield Twp., Bucks County [PaEN]
-- DEP Releases Companies, Individuals Receiving $7.24 Million In Federal Funds To Plug 329 Conventional Gas Wells In 13 Counties [PaEN]
-- Susquehanna River Basin Commission Low Flow Water Conditions Trigger Water Withdrawal Restrictions On 39 Shale Gas Water Withdrawal Points In PA, 20 More In Caution [PaEN]
-- Delaware River Basin Commission Approves Extension Of Permit For Proposed Docks At Gibbstown LNG Gas Export Terminal In NJ [PaEN]
-- PUC Approves 6.7% Increase In UGI Gas Monthly Bills Effective Oct. 28 [PaEN]
-- US Energy Information Administration Expects Nearly 48% Increase In Natural Gas Prices Into Next Year Due To Flat Gas Production, Increased LNG Gas Exports
-- PUC Finalized Plan To Accelerate Replacement Of Older At-Risk Plastic Pipe And Components In Natural Gas Distribution Systems [PaEN]
-- PUC Electric Power Outlook: Risks To Adequate Electricity Supplies May Emerge In PJM By 2033; Extreme Cold Constraints On Natural Gas Availability Could Risk Outages As Early As 2026 [PaEN]
-- AP: US Electric Grids Under Pressure From Energy-Hungry A.I. Data Centers Are Changing Strategy - Bumping Data Centers Off Grids During Power Emergencies [PJM Included]
-- The Center Square: Report - PA Electric Companies Struggle With Outages
-- In Case You Missed It -- A.I./Data Center Articles & NewClips From Last Week - September 15 [PaEN]
-- EPA To Allow Construction Of Power Plants, Industrial Facilities Before Air Quality Permits Are In-Hand [PaEN]
NewsClips:
-- Observer Reporter: 2 Townships In Greene County Declare Disaster Emergencies Over Contaminated Water Wells [PDF of Article]
-- Inside Climate News - Jon Hurdle: Two Greene County Townships Declare Disaster Emergencies, Seek Public Funding For Drinking Water Systems Amid Claims That Shale Gas Industry Contaminated Wells
-- PA Capital-Star/Inside Climate News: Two Greene County Townships Declare Disaster Emergencies, Seek Public Funding For Water Systems Amid Claims The Gas Industry Contaminated Water Wells
-- Delaware Currents: DRBC Grants 5-Year Extension For Gibbstown, NJ LNG Gas Export Facility Dock Project
-- The Derrick: Aqua Pennsylvania Issues Boil Water Advisory For Village Of Reno In Venango County Due To Bacteria In Water Hauled To The System To Make Up For Water Contaminated By Conventional Oil Well Spill In July 2023 [PDF of Article]
-- Pittsburgh Business Times: PUC Orders PA Natural Gas Utilities To Catalog Older Plastic Pipes For Safety Concerns [PDF of Article]
-- Post-Gazette - Anya Litvak: The Risk And Reward Of Having A.I. Data Centers As Electric, Water Utility Customers
-- Pittsburgh Business Times: EQT CEO Urges Rapid Energy Development To Fuel A.I. Race Against China
-- Bloomberg: Natural Gas Markets Brace For Glut With No Sign Of China Demand Rebound
-- Reuters Guest Essay: Europe Succumbs To US ‘Energy Dominance’ At Its Own Risk
[Posted: September 13, 2025] PA Environment Digest

No comments :
Post a Comment